Like Lindner said, wrenches are flying all around...
The Liquifire motor is buttoned up with the small exception of carb flanges. Found that the old ones from 8 years ago were starting to dry rot and crack, so a new set were ordered from New Breed. While I started with the same motor from last year, not much of it is left. The cases and studs are NOS, a new Jerome Kretzman crankshaft, fresh jugs with nicasil, new Wiseco's and "CD" rings, new coil, reconditions set of heads, plus an NOS stator. So it's basically the same flywheel, recoil, flywheel cover, gear box cover, water, oil pump and manifolds from last year
Then it was onto the chassis. Glad to took it down for inspection. I haven't had the track out since I powder coated the chassis back in 2013, and it was due. Left side drive axle bearing was staring to go, and the jackshaft was toast again. Darn bolt on the top gear came loose, so the bearing ate the shaft on the chain case end. Good new was that the track and drive axle looked ready to go another thousand miles.
The suspension had two locked idlers wheels, and a small one was missing, but otherwise looked ok with no damage. All parts are on order and the last minute dash is on. The wiring hardness was scrapped and an NOS one installed to finally eliminate the gremlins I have been chasing for years.
At least Adam tells me the Dator starts and runs great, and is already loaded for the I-500. He seems to have that one mostly sorted out from last year. We shall see as I have a week before I head north...
-Joe